본문 바로가기


명지대학교 건설관리연구실

사이트 내 전체검색

PUBLICATIONS

Journal Papers (International)

Journal Papers (International)

Jung, Y. and Woo. S. (2004). "Flexible Work Breakdown Structure for In…

페이지 정보

작성자 CICMS 작성일14-01-14 10:59 조회802회 댓글0건

첨부파일

본문

Jung, Y. and Woo. S. (2004). "Flexible Work Breakdown Structure for Integrated Cost and Schedule Control", Journal of Construction Engineering and Management, ASCE, 130(5), 616-625. SCIE.
 
Abstract
Integration of cost and schedule control systems has been an issue of great concern for researchers and practitioners in the construction industry. Nevertheless, the real-world implementation of this promising concept has not been popular enough to maximize the benefits that this integration has to offer. One of the major barriers is the overhead effort to collect and maintain detailed data. The purpose of this paper is to propose a flexible work breakdown structure (WBS) that optimizes the overhead effort by means of reducing the amount of data to be controlled. In order to have a flexible structure, the WBS numbering system needs to utilize standard classification codes and should not have a common strict hierarchy for all components. A case study is analyzed this paper in order to examine the proposed concept. Practical implications are outlined as well.